• Finalize site agreements
  • Complete environmental surveys
  • Conduct engineering analysis of site’s hydrology and subsurface condition
  • Construction Certificate from the Kentucky Electric Generation and Transmission Siting Board granted on 10/24/25. Learn More HERE
  • Finalize interconnection agreements with transmission owners
  • Begin Construction
  • Launch Operation